| RUN_DATETIME |
datetime(3)  |
datetime2(0)  |
Date processing of the run begins. Generated from the solution file caseid |
| RUN_NO |
numeric(3, 0)  |
smallint  |
Unique run id. Generated from the solution file caseid |
| PASAVERSION |
varchar(10) |
varchar(10) |
Version of the PASA solver used to solve this case |
| RESERVECONDITION |
numeric(1, 0) |
tinyint |
Low Reserve Condition (LRC) flag for the case (1 - LRC in the case, 0 - No LRCs in the case) for capacity run |
| LORCONDITION |
numeric(1, 0) |
tinyint |
Lack of Reserve Condition (LOR) flag for the case indicates the most severe condition in the case (3 = LOR3, 2 = LOR2, 1 = LOR1, 0 = No LOR) |
| CAPACITYOBJFUNCTION |
numeric(12, 3) |
numeric(12, 3) |
Objective Function from the Capacity Adequacy run |
| CAPACITYOPTION |
numeric(12, 3) |
numeric(12, 3) |
Not populated as of 2005 End of Year Release; was the demand forecast used for capacity adequacy assessment: 0 = no assessment, 1 = 10%, 2 = 50%, 3 = 90% |
| MAXSURPLUSRESERVEOPTION |
numeric(12, 3) |
numeric(12, 3) |
Not populated as of 2005 End of Year Release; was the demand forecast used for assessment of Maximum surplus Reserve: 0 = no assessment, 1 = 10%, 2 = 50%, 3 = 90% |
| MAXSPARECAPACITYOPTION |
numeric(12, 3) |
numeric(12, 3) |
Not populated as of 2005 End of Year Release; was the demand forecast used for assessment of Maximum Spare Capacity: 0 = no assessment, 1 = 10%, 2 = 50%, 3 = 90% |
| INTERCONNECTORFLOWPENALTY |
numeric(12, 3) |
numeric(12, 3) |
The penalty for non-zero interconnector flow |
| LASTCHANGED |
datetime(3) |
datetime2(0) |
Date and time the record was created or modified |
| RUNTYPE |
varchar(50) |
varchar(50) |
Discontinued in Dec 2005; was description of the constraints included in this run, being either System Normal and Planned Outage Constraints or System Normal Constraints Only |
| RELIABILITYLRCDEMANDOPTION |
numeric(12, 3) |
numeric(12, 3) |
Specifies the Probability of Exceedence (POE) demand forecast for Reliability LRC assessment (0 if no assessment, 10 for 10%, 50 for 50%, 90 for 90%) |
| OUTAGELRCDEMANDOPTION |
numeric(12, 3) |
numeric(12, 3) |
Specifies the Probability of Exceedence (POE) demand forecast for outage LRC assessment (0 if no assessment, 10 for 10%, 50 for 50%, 90 for 90%) |
| LORDEMANDOPTION |
numeric(12, 3) |
numeric(12, 3) |
Specifies the Probability of Exceedence (POE) demand forecast for LOR assessment (0 if no assessment, 10 for 10%, 50 for 50%, 90 for 90%) |
| RELIABILITYLRCCAPACITYOPTION |
varchar(10) |
varchar(10) |
Generation Availability to be used in Reliability LRC run (either PASA or MARKET) |
| OUTAGELRCCAPACITYOPTION |
varchar(10) |
varchar(10) |
Generation Availability to be used in Outage LRC run (either PASA or MARKET) |
| LORCAPACITYOPTION |
varchar(10) |
varchar(10) |
Generation Availability to be used in LOR run (either PASA or MARKET) |
| LORUIGFOPTION |
numeric(3, 0) |
smallint |
UIGF POE forecast availability used for this option |
| RELIABILITYLRCUIGFOPTION |
numeric(3, 0) |
smallint |
UIGF POE forecast availability used for this option |
| OUTAGELRCUIGFOPTION |
numeric(3, 0) |
smallint |
UIGF POE forecast availability used for this option |